QTO-OGS-Q1944CE-REPLACE ELECTRICAL PANELS

$495.00

SKU: N/A Category:

Description

QTO-OGS-Q1944CE — REPLACE ELECTRICAL PANELS

Project Overview

Accurate Construct Solutions LLC provides construction quantity takeoff (QTO) services to help electrical contractors, subcontractors, and estimators prepare organized, drawing-based quantities for bid preparation.

The New York State Office of General Services (OGS), Design & Construction, lists the Replace Electrical Panels project at MacCormick Secure Center, 300 South Road, Brooktondale, Tompkins County, New York.

The project has separate construction and electrical contracts. This listing is for the Q1944E electrical contract, with an official estimated contract value of $2,000,000–$3,000,000.

Official Project Details

  • Project ID: Q1944E
  • Project Name: Replace Electrical Panels
  • Issuing Agency: New York State Office of General Services (OGS), Design & Construction
  • Facility: MacCormick Secure Center
  • Location: 300 South Road, Brooktondale, NY
  • County: Tompkins County
  • Estimated Electrical Contract Value: $2,000,000–$3,000,000
  • Bid Due Date: November 18, 2026
  • Pre-Bid Meeting: November 5, 2026, at 10:00 AM
  • MWBE Goal: 15% minority-owned and 15% women-owned participation, as listed by OGS
  • SDVOB Goal: 6%

Important: Confirm the latest solicitation, scope, bid requirements, participation goals, and deadlines against the official bid documents and addenda before submitting a bid.

Electrical Quantity Takeoff Services

ACS can review the available project drawings, specifications, panel schedules, electrical details, and addenda to identify measurable electrical work within the requested scope.

Depending on the documents and contract requirements, a project-specific electrical QTO may include:

  • Electrical panel and distribution equipment quantities
  • Panel schedules and associated equipment, where shown
  • Electrical feeders, conductors, and conduit quantities, where measurable
  • Related electrical devices, accessories, and installation materials, where included in the documents
  • Drawing-based quantity summaries organized for contractor pricing
  • Clarifications, assumptions, and items requiring confirmation

The final takeoff scope depends on the issued drawings and specifications. These items are examples of potential takeoff categories, not a representation of verified quantities or confirmed contract requirements for Q1944E.

Why Choose Accurate Construct Solutions?

  • Drawing-based quantity takeoffs for construction bidding
  • Organized quantity breakdowns to support estimating and subcontractor pricing
  • Excel and PDF deliverables, subject to the selected service
  • Quality-review procedures
  • Addendum-related quantity updates when included in the applicable service
  • Support for public construction projects across New York

Our typical turnaround target is 24–48 hours for suitable scopes, depending on project size, drawing quality, document completeness, and workload. Confirm the delivery schedule for this project before ordering.

Request the Q1944E Electrical Takeoff

Need help preparing your electrical bid? Contact ACS to confirm drawing availability, the required scope, deliverables, pricing, and turnaround time.

Website: https://accurateconstructsol.com/
Email: [email protected]
Phone: (716) 406-4935

Please note: This product listing does not itself confirm that a completed Q1944E takeoff, drawings, or specifications are available for immediate download. Confirm availability before purchasing.

Official Project Source

Review the official OGS Q1944 project page for bid documents, addenda, and current solicitation information.


Related ACS Pages — Internal Links

  1. ACS Construction Estimating Services
  2. Available Construction Projects
  3. ACS Subscription Plans
  4. Free Trial for Construction Takeoff Services
  5. Construction Takeoff vs. Cost Estimate
  6. Construction Drawing Review Guide
  7. OGS Replace Fan Coil Units — Sample Project
  8. OGS Renovate Armory — Sample Project
  9. ACS Project Archive
  10. ACS Homepage

Official and Relevant External Resources — Outbound Links

  1. Official OGS Q1944 Project Listing
  2. OGS Plans Available and Bid Documents
  3. New York State Office of General Services
  4. OGS Design & Construction
  5. OGS Restricted Period Lists — Design & Construction
  6. New York State Contract Reporter
  7. New York State MWBE Hub
  8. New York State Service-Disabled Veteran-Owned Business Portal
  9. OGS Design Procedures Manual

External links are provided for project verification, procurement guidance, and relevant New York State contracting resources. Always rely on the latest official solicitation and addenda for binding requirements.

Additional information

QTO Slot

QTO 1

Reviews

There are no reviews yet.

Be the first to review “QTO-OGS-Q1944CE-REPLACE ELECTRICAL PANELS”

Your email address will not be published. Required fields are marked *