Description
QTO-DASNY-Baruch College – Newman Hall Façade Restoration
QTO-DASNY-Baruch College – Newman Hall Façade Restoration is a construction quantity takeoff project for the CUNY Baruch College Newman Hall Façade Restoration and Hazardous Materials Abatement project in Manhattan, New York. The project is being administered by the Dormitory Authority of the State of New York (DASNY) and is located at 137 East 22nd Street, New York, NY 10010. The official DASNY solicitation identifies the project as Solicitation 389700 / C1924 – General Construction.
The project addresses unsafe façade conditions at Newman Hall and includes a range of masonry and stone restoration work. According to the official solicitation, the scope includes brick and anchor replacement, loose lintel replacement, sealant joint replacement at coping, stone mortar repointing, limestone and granite crack repairs, stone spall repairs, stone Dutchman restoration, stone column capital repairs, and coping replacement. The project also includes hazardous materials abatement involving lead-containing coatings.
Quantity Takeoff and Estimating
A detailed quantity takeoff helps contractors identify the materials, quantities, and construction items required for accurate bid preparation. For a façade restoration project such as Newman Hall, estimating may involve reviewing drawings and specifications to quantify masonry repairs, replacement brick and stone, mortar and sealant work, lintels, coping, façade restoration items, and related construction requirements.
ACS provides construction quantity takeoff and estimating services for contractors working on New York construction projects. Our estimating process is designed to help contractors organize quantities, review project requirements, and prepare more reliable bids.
Contractors can also review the ACS project portfolio for examples of construction estimating and quantity takeoff work.
Project Scope
The documented façade restoration scope includes:
- Brick and anchor replacement
- Loose lintel replacement
- Coping sealant joint replacement
- Stone mortar repointing
- Limestone crack repair
- Granite stone crack repair
- Stone spall repair
- Limestone Dutchman restoration
- Stone Dutchman restoration
- Stone column capital repair
- Coping replacement
- Hazardous materials abatement involving lead-containing coatings
The official DASNY notice places the estimated construction cost between $855,000 and $900,000.
DASNY Construction Opportunity
DASNY issued the solicitation on September 18, 2026. The project is classified as a construction contract and is designated for Minority, Women and Small Business Enterprises. The solicitation lists goals of 18% MBE, 12% WBE, 6% SDVOB, and 45% EEO. The bid deadline is October 29, 2026 at 2:00 PM.
For contractors researching the opportunity, the official DASNY construction contract opportunities page provides access to current public construction solicitations and procurement information.
The DASNY bid opening schedule also lists the Newman Hall project with a bid opening scheduled for October 29, 2026 at 2:00 PM.
Why Accurate Takeoffs Matter for Façade Restoration
Façade restoration projects require careful measurement because repair quantities can vary significantly by material and condition. Brick replacement, stone repairs, repointing, coping work, lintel replacement, sealants, and hazardous-material requirements all need to be reviewed against the project documents before pricing.
A professional QTO gives contractors a structured quantity baseline for developing labor, material, equipment, subcontractor, and overall bid pricing. ACS helps contractors reduce the time spent manually measuring drawings while improving consistency in their estimating workflow.
For additional information about ACS services, visit Accurate Construct Solutions or review our construction estimating services.
Get Construction Estimating Support
If your company is bidding on the DASNY Baruch College Newman Hall Façade Restoration project or another New York public construction opportunity, ACS can assist with detailed quantity takeoffs and estimating based on the available project drawings and specifications.
Explore the ACS free 7-day trial to see how professional quantity takeoff services can support your construction bidding process.




Reviews
There are no reviews yet.